Summer is here! Back in January when I was having two frostbitten toes on my right foot amputated as a result of the cold working conditions at the museum, I dreamed of the hazy, lazy days of summer. Now those days are here and frankly, it’s just too nice out to work. Apparently #3 and #4 feel the same way because we haven’t seen hide nor hair of them for a couple of weeks now. With no restoration workers to approach and annoy, I’ve had to turn my attention back on the Director (you can imagine how thrilled that makes her). Right off the bat the Director let me know that #3 and #4 were not off enjoying the sun somewhere but were actually working on the windows at Western Restoration’s shop.
Half of the exterior storm frames are sitting here on the premises. I know this not just because the Director said it was so, but also because I walk by them everyday where they are stored in the south kitchen right outside my office. What I didn’t notice was that the stack of exterior storm window frames have been shrinking in number. As much as I would like to believe that #3 and #4 are highly trained ninjas who have mastered the skill of sneaking into a building and removing large rectangular objects shaped like windows with no detection, the truth is I’m not the most observant lookout in the crow’s nest. If I were on duty the night the Titanic hit the iceberg I probably wouldn’t have realized anything was amiss until I felt the icy Atlantic lapping at my toes. Those exterior storm window frames have been systematically removed and carried off to the shop where they are being finished and prepared for installation. The majority of the exterior frames still in the kitchen are painted already, and #3 and #4 have already fitted all of the exterior storm window frames to the openings of the windows. That’s not all, the shutters are also finished and apparently waiting at the shop for a visit from the Director.
In regard to interior windows: Overall, 30 of the 46 windows in the house have been removed, restored and reinstalled. The attic windows, removed over the past month or so, are in the process of being restored at the shop. The basement windows are a little bit more needy. Turns out given their condition, they will have to be rebuilt. Hey Jude would like to use a different wood than was originally called for in the specifications to rebuild the windows with which will involve a change of work order.
Since #3 and #4 aren’t actually off catching the sun’s rays anywhere and since it seems like someone ought to – I have made the ultimate sacrifice and offered to volunteer myself for this duty. So the week of July 9th I report for duty at Long Beach Island, NJ where I promise to do my best to soak up as much of the sun as I possibly can while taking breaks to eat fresh sea food and sleep. It’s a tough job. I hope I can handle it. I’ve given myself plenty of time to try. Wish me luck.
No comments:
Post a Comment